How in-line meters save our customer from a costly retrofit

Challenge:

Customer has recently built a data center using dumb power strips without any metering capability. But company’s upper management issued the mandate for energy conservation and as part of that, the data centers had to report on power consumption at the cabinet level. Customer did not want to retrofit all 350 power strips for metered with Ethernet strips.

 

Mirapath donates to Cupertino School District

Cupertino, CA (May 3, 2010) – Mirapath, a data center and lab infrastructure solution provider, has joined the fight to help saves schools in Cupertino, CA by donating to the “Their Future Is Now!” campaign.

 

Entertainment Company Wants Best Out of Band Solution

Challenge:
  • Customer needs out of band access to routers, switches, servers and UPS'  using a dial-up connection for 22 US and 11 International WAN sites.
  • Customer feature requirements are internal modem, minimal additional adapter/cabling requirement, ease of set up, strong security authentication and international warranty support.
  • Customer also has a target budget number which includes all international shipping and customs/duties charges.
Solution:
  • Based on customer requirements, Mirapath recommended three different console servers to the customer, highlighting their similarities, differences, and impact on installation and usage of the device.
  • Mirapath solution specialist provided onsite demo of all three solutions. Customer had the opportunity to test each solution interface.
  • Based on Mirapath’s recommendations and onsite demo, customer made a well researched and confident decision.
Result:
  • Mirapath dropped shipped to each and all individual locations arranging for international logistics and documentation. – Customer internal overhead of cutting multiple Purchase Orders and coordinating their own logistics was minimized.
  • Mirapath included the appropriate international power cord for each international site – customer was confident that they could install locally without further research on correct power cords and unnecessary down time.
  • Mirapath had best practice session with customer lead engineer to jump start the installation process – saved customer time and maximized value of IT equipment investment.
  • Entire project was delivered under budget and 33 sites were delivered on time.
 

Console Server Dilemma

Situation:

A customer was in search of a console server solution for their remote sites that provides out of band access to their network equipment. The customer has about 30 sites in the USA, Asia and Europe.

 

Gaming company switches to 208V 30Amps 3phase power - Reducing number of drops per cabinet and generated savings of over 45%.

Challenge:

Customer is expanding to a new collocation facility. They are considering different power strips and ways to maximize power drops, densities, and rack space. In their past configuration, the customer used 208V 30Amps single phase power. Each rack has 4 feeds totaling 20 KW of usable power.

 


Login

Login or register to access our Knowledge Center and other Technical Resources.

MiraNews

Mirapath is sponsoring The Data Center Summit, which is a partnership between the Silicon Valley Leadership Group, the California Energy Commission and the Lawrence Berkeley National Lab.

The Data Center Efficiency Summit is a one day forum that focuses on best practices and emerging technologies/applications that reduce data center costs and significantly increase efficiencies for both legacy and new construction.

Data Center operators present case studies on their efficiency projects accompanied by actual results and ROIs. Projects cover both IT optimization options and facilities related energy efficiency improvements that increase data center efficiencies.

Read more...